Home Building Estimates | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
2 for 1 Sale! |
At your request, we will provide estimates on any 2 plans for the cost of 1 so that you may compare their cost!
Jut fill in 2 plan numbers instead of 1 in the space provided.
|
|
|
If you buy a set of house plans, get bids, and then find out that you cannot afford to build that home, you may have lost the cost of the home plans, but you have not lost your dream! You can then get another set of plans for a home you can afford!
If you wish to lower the risk of buying home plans you may not be able to use, we will provide an estimate of the homebuilding cost for any of the home plans that are displayed on this site. We will adjust the cost to your city and state in the U.S. or Canada.
You may find other sites that offer free estimates, but you will find that they use a simple square foot price for all homes regardless of amenities, whether it has a basement or not, a garage or not, brick or vinyl siding, or even whether it is one or two story!
They expect you to believe the cost is the same!
We estimate each house plan individually, based on its unique features and with the materials actually used in building the home!
We guarantee the new home estimate will be sent to you via E-mail within 48 hours, (usually within 24 hours).
(Sample Estimate at the bottom of this page)
The homebuilding estimate will include the cost of material as specified in the house plans or national averages where they are not specified, (such as fixtures, carpet and cabinets), labor costs for skilled labor in your area, the cost of house plans, and assumes a general contractors profit. If you act as your own general contractor, you should deduct the profit.
The estimates will be separated into the
major building phases with labor and material for each.
(Except for the garage plans noted below)
Total labor and material will also be provided in the estimate.
The square foot cost for each home will be provided, except for the garage plans noted below.
The estimate will not reflect the cost of the lot, special site conditions which we are unaware of, such as rock or tree removal, sloping lots, flood plains or the cost of excessive fill. The estimate will assume municipal services, and therefore, not include a well or septic system.
Best uses are to determine if you can afford a particular home before you
invest in plans,
and to approximate savings if you can do some
of the work yourself.
You may also compare the estimate to bids you get from contractors.
We have nothing to gain by making
an estimate higher or lower than it really is!
It is our honest opinion. We are not trying to build or contract your home!
Note;
Garage plans 4356, 4404, 4502, 4526, 4527, 9273, 9274, 9275 and 9277 will be a
single total only!
All homebuilding estimates will be sent within 48 hours, (usually within 24 hours).
All homebuilding estimates are based on the plans as they are drawn without modifications.
We can only provide estimates for plans listed on this site.
You can save hundreds for only $29.95 !
That is much less expensive than buying house plans you may not be able to use!
The estimate will be adjusted to your geographic area of the US or Canada.
All homebuilding estimates will be sent via E-mail! Make sure your E-mail address is valid!
Where do you plan to build your home?
Customer credit cards will be billed $29.95 as Andy's How To Homebuilding
All homebuilding estimates will be sent within 48 hours, (usually within 24 hours).
Note;
Garage plans 4356, 4404, 4502, 4526, 4527, 9273, 9274, 9275 and 9277 will be a
single total only!
Member Better Business Bureau
|
Estimate |
For |
Plan # 0000 |
0000 |
sq.ft. |
||||
|
Built in |
xxxxxx, xx |
|||||||
|
Phase |
Description |
Labor |
Material |
Total |
||||
|
Preparation |
Plans, Permits & Insurance |
$0 |
||||||
|
Excavation |
Site Preparation |
$0 |
||||||
|
Foundation |
Foundation, Piers & Concrete |
$0 |
$0 |
$0 |
||||
|
Carpentry |
Rough & Finish Carpentry |
$0 |
$0 |
$0 |
||||
|
Roofing |
Roofing & Flashing |
$0 |
$0 |
$0 |
||||
|
Doors & Windows |
Doors, Windows & Hardware |
$0 |
$0 |
$0 |
||||
|
Exterior Finish |
Brick, Siding, Masonry, Stucco etc. |
$0 |
$0 |
$0 |
||||
|
Plumbing |
Rough Plumbing, Connections & Fixtures |
$0 |
$0 |
$0 |
||||
|
(Well & Septic System Not Included) |
||||||||
|
HVAC |
Heating & Air Conditioning Systems |
$0 |
$0 |
$0 |
||||
|
Electrical |
Electrical System & Fixtures |
$0 |
$0 |
$0 |
||||
|
Insulation |
Ceiling & Wall Insulation |
$0 |
$0 |
$0 |
||||
|
Drywall |
Installation, Taping & Sanding |
$0 |
$0 |
$0 |
||||
|
Flooring |
Hardwood, Tile, Carpet etc. |
$0 |
$0 |
$0 |
||||
|
Cabinets |
Cabinets, Countertops, Built-Ins |
$0 |
$0 |
$0 |
||||
|
& Built In Appliances |
||||||||
|
Incidentals |
Mirrors, Paper Holders etc. |
$0 |
$0 |
$0 |
||||
|
Painting |
Painting & Staining |
$0 |
$0 |
$0 |
||||
|
Profit |
General Contractors Profit |
$0 |
||||||
|
Total Estimate |
$0 |
$0 |
$0 |
|||||
|
Square foot |
Cost per square foot |
|||||||
|
of living space |
00.00 |
|||||||
Sorry, no refunds,
as you will already have the estimate, and it cannot be taken back!
Nor can we change the homebuilding estimate because someone does not like the number. It is
our honest opinion of the cost and we have spent years preparing plans and
building homes.
We cannot give estimates on modifications.
We cannot provide home estimates over the phone!
|